Deprecated: Function pll_the_languages() was called with an argument that is deprecated since version 3.9! See the documentation of pll_the_languages() in /home/coceptio/domains/coceptio.eu/public_html/wp-includes/functions.php on line 6131
CoCEPTIO » GSK - Revamping WN27 - CoCEPTIO
Accueil » Références » GSK – Revamping WN27

GSK – Revamping WN27

Date: 2022

Sector: Pharma

Amount of investment: € 1,300,000

The project

Turnkey Capex project.

Revamping of part of building WN27

Modifications to the building with a view to placing and installing Freezer SUS units (incl. HVAC modifications).

Transformation of Passboxes into Passboxes with the same internal dimensions as the corresponding Lift.

Installation of a Pass-Tube between production units A and B.

Customer experience The customer very much appreciated CoCEPTIO’s rapid, constructive and innovative action during the detailed design phase, as well as the quality of the specifications produced.


Opération en cours ...